|
|
Project Highlights |
 |
ExcelTec has in its execution record projects of technical high level, from the conceptualization, basic engineering and of detail, facing high levels in investigation and development.
|
|
Consultancy & Development Planning Studies. |
 |
- Independent study for estimating the local capacity and potential participation in offshore gas projects (COSPANGAS). Chevron, Statoil, MSLNG, PDVSA. Together with BC&A and NEXO. (2006).
- PDVSA CVP technical studies. Offshore & onshore License. (2004-2005).
- Tomoporo Field. Cost & Schedule Estimate. Statoil (2002).
- Plataforma Deltana. Local Content and Venezuela Industry Mapping. Statoil (2002).
- Medium term offshore exploration opportunities. Cost, schedule & Drilling Schemes. PDVSA (2001-2001).
- Plataforma Deltana Studies. PDVSA (2002-Present).
- Tomoporo Field options Development Studies. PDVSA (2000-2001).
- PDVSA CVP technical studies(1997-1999 & 2001-Present).
- Infrastructure data support & development options. 3d round bids. Shell , CNXY. (1996, 1998).
- Eastern Venezuela offshore gas development planning studies. Lagoven.
- Cristobal Colon Project. Upstream development planning. Lagoven, Shell, Exxon, Mits. (1992-1994).
- Venezuela Industrial development planning pilot study. PDVSA (Joint with IHS Energy) (1993-1996).
- Guamal (remote onshore field) appraisal study. PDVSA (1998).
- East & West divisions asset optimization studies (Macroproyecto Incremental Reservas). Lagoven (1994-1995).
- Sur del Lago (Maracaibo) Xtra-light oil appraisal study. Lagoven (1998).
- Maturin East New areas appraisal study. Apertura Venezuela. 8 Blocks (1992-1993).
- Rio Caribe gas & condensate production options studies. Lagoven (1990-1991).
- Monagas heavy oil development options (PRISMA). Lagoven (1996-1997).
|
Environmental Studies. |
 |
- Rio Caribe Project. Environmental Impact Study. Lagoven (1991-1992).
- Aperture Areas. Data Gathering, sampling & Analysis Guidelines (1994-1995).
- Posa Platform decommissioning. Env. safety audit. Contingency Plan Eng. Lagoven (1992-1993).
- Cristobal Colon Project. Environmental Impact Study. References Terms & Plans. Lag., Exxon, Shell, Mitsubishi(1996).
- Remote areas. Options for disposal of exploratory drilling waste. PDVSA.(1998).
- Golfo de Venezuela, Falcon Nor Este, Ensenada de la Vela. Preparation of questionnaires for Authorization of Territorial Occupance (AOT). PDVSA (2004).
|
| Technical Assistance. |
 |
|
Front End Engineering & Conceptual Design. |
|
 |
- Centralization of light San Tome west infrastructure. PDVSA. (2002).
- La Salina & Tia Juana port facilities evaluation and Revamping. Lagoven. (1994-1995).
- POSA platform decommissioning engineering. Lagoven. (1994-1995).
- Production Test Barge 3457. Conversion to FSO. Lagoven. (1994).
- Rio Caribe Project logistic Base (Carupano). Basic Engineering. Lagoven. (1992).
|
| Simulation and Model Development. |
 |
ExcelTec has executed Model Development and Simulation Projects using simulation tools such as WITNESS. WITNESS is a tool capable of supporting discrete and continuous systems for business simulation.
Relevant models and studies:
- ASCAM. Supply & distribution of hydrocarbons in Caracas. Dual or single system. PDVSA. (2000-2001).
- FERROCAR. Freight and passenger train system. western Venezuela. IAFE (2000).
- TAP Caripito – Guiria crude oil transport and deep water terminal study. PDVSA, BP & AMOCO. (1997-1998).
- Maracaibo Lake. Dedicated barges to supply Boats Logistics reengineering. Lagoven. (1993-1994).
- Lake Maracaibo Drilling & RA – RC assignment schedule optimization. Lagoven (1994-1996)
|
| Development of Methodology, Digital Models & IT Applications / Technical Software. |
 |
- WITNESS Models. (TAP, Ferrocar, ASCAM)(1997-1998, 1999-2001, 2001-2002).
- Optimal drilling and RA / RC schedule of Mobile units. Lake Maracaibo. (RUTAS) Lagoven.
|
| Public and Private Sectors. |
 |
- Cooling and Fanning System, Line 3, Cametro (1991): IPC of water cooling systems and forced fanning. Covering the acquisition of advance and deviation control mechanisms, setting up support procedures and general plan.
- Management Support, Hidrocapital (1991): Budget planning, management control, bids, and organizational development.
- Telephone exchange of Boleíta y Los Palos Grandes, Michelena, Valencia, Carabobo State station.
- aAdaptation of type PATS telephone exchange (Pto. La Cruz, Carúpano, El Vigía and San Juan de Los Morros).
|
|
 |
|
|
Untitled Document
Derechos Protegidos :: EXCELTEC, C.A. RIF J-00285438-3 - 2010 - 2011 Mantenimiento www.pasherdesign.net
Av. Abraham Lincoln, Torre Domus, Piso 9, Oficina 9-C,
Caracas. Venezuela.
Telfs. 0212- 794.09.33 - Fax: 0212 793.87.02
|
|
|