| Project Highlights |
| ExcelTec
has in its execution record projects of technical high level, from the
conceptualization, basic engineering and of detail, facing high levels
in investigation and development. |
|
| Consultancy &
Development Planning Studies. |
Independent
study for estimating the local capacity and potential participation in
offshore gas projects (COSPANGAS). Chevron, Statoil, MSLNG, PDVSA.
Together with BC&A and NEXO. (2006).
PDVSA
CVP technical studies. Offshore & onshore License. (2004-2005).
Tomoporo
Field. Cost & Schedule Estimate. Statoil (2002).
Plataforma
Deltana. Local Content and Venezuela Industry Mapping. Statoil (2002).
Medium
term offshore exploration opportunities. Cost, schedule &
Drilling Schemes. PDVSA (2001-2001).
Plataforma
Deltana Studies. PDVSA (2002-Present).
Tomoporo
Field options Development Studies. PDVSA (2000-2001).
PDVSA
CVP technical studies(1997-1999 & 2001-Present).
Infrastructure
data support & development options. 3d round bids. Shell ,
CNXY. (1996, 1998).
Eastern
Venezuela offshore gas development planning studies. Lagoven.
Cristobal
Colon Project. Upstream development planning. Lagoven, Shell, Exxon,
Mits. (1992-1994).
Venezuela
Industrial development planning pilot study. PDVSA (Joint with IHS
Energy) (1993-1996).
Guamal
(remote onshore field) appraisal study. PDVSA (1998).
East
& West divisions asset optimization studies (Macroproyecto
Incremental Reservas). Lagoven (1994-1995).
Sur
del Lago (Maracaibo) Xtra-light oil appraisal study. Lagoven (1998).
Maturin
East New areas appraisal study. Apertura Venezuela. 8 Blocks
(1992-1993).
Rio
Caribe gas & condensate production options studies. Lagoven
(1990-1991).
Monagas
heavy oil development options (PRISMA). Lagoven (1996-1997). |
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
Environmental
Studies.
|
Rio Caribe Project.
Environmental Impact Study. Lagoven (1991-1992).
Aperture Areas. Data Gathering,
sampling & Analysis Guidelines (1994-1995).
Posa Platform decommissioning.
Env. safety audit. Contingency Plan Eng. Lagoven (1992-1993).
Cristobal Colon Project.
Environmental Impact Study. References Terms & Plans. Lag.,
Exxon, Shell, Mitsubishi(1996).
Remote areas. Options for
disposal of exploratory drilling waste. PDVSA.(1998).
Golfo
de Venezuela, Falcon Nor Este, Ensenada de la Vela. Preparation of
questionnaires for Authorization of Territorial Occupance (AOT). PDVSA
(2004). |
|
|
|
Technical
Assistance.
|
Management
assistance, Lagoven (1995 - 1996): Support to the Technology of the
Western Division of Lagoven, in its production, transportation,
financial and operating control process, planning and analysis,
feasibility studies and evaluation of technical and commercial bids.
ARAR, Lagovén (1996 -
1997):
* Design and implementation of
the early capture of talent.
* Replacement of specialized
personnel in operating areas.
New Business management, Lagoven
(1996 - 1997): Exploration and exploitation of LNG. |
|
|
|
|
 |
|
|
|
Development of Methodology, Digital Models
& IT Applications / Technical Software.
|
WITNESS
Models. (TAP, Ferrocar, ASCAM)(1997-1998, 1999-2001, 2001-2002).
Optimal
drilling and RA / RC schedule of Mobile units. Lake Maracaibo. (RUTAS)
Lagoven. |
|
|
|
Public
and Private Sectors.
|
Cooling
and Fanning System, Line 3, Cametro (1991): IPC of water cooling
systems and forced fanning. Covering the acquisition of advance and
deviation control mechanisms, setting up support procedures and general
plan.
Management
Support, Hidrocapital (1991): Budget planning, management control,
bids, and organizational development.
Telephone
exchange of Boleíta y Los Palos Grandes, Michelena,
Valencia, Carabobo State station.
Adaptation
of type PATS telephone exchange (Pto. La Cruz, Carúpano, El
Vigía and San Juan de Los Morros). |
|
|
|
|
|
|
|