Torre Domus, piso 9, Of. 9C
Sabana Grande, 
Caracas-1050, D.C.
Venezuela
Tel:+58(212)794-0933
Fax:+58(212)793-8702
Project Highlights
ExcelTec has in its execution record projects of technical high level, from the conceptualization, basic engineering and of detail, facing high levels in investigation and development.

Consultancy & Development Planning Studies.
Independent study for estimating the local capacity and potential participation in offshore gas projects (COSPANGAS). Chevron, Statoil, MSLNG, PDVSA. Together with BC&A and NEXO. (2006).
PDVSA CVP technical studies. Offshore & onshore License. (2004-2005).
Tomoporo Field. Cost & Schedule Estimate. Statoil (2002).
Plataforma Deltana. Local Content and Venezuela Industry Mapping. Statoil (2002).
Medium term offshore exploration opportunities. Cost, schedule & Drilling Schemes. PDVSA (2001-2001).
Plataforma Deltana Studies. PDVSA (2002-Present).
Tomoporo Field options Development Studies. PDVSA (2000-2001).
PDVSA CVP technical studies(1997-1999 & 2001-Present).
Infrastructure data support & development options. 3d round bids. Shell , CNXY. (1996, 1998).
Eastern Venezuela offshore gas development planning studies. Lagoven.
Cristobal Colon Project. Upstream development planning. Lagoven, Shell, Exxon, Mits. (1992-1994).
Venezuela Industrial development planning pilot study. PDVSA (Joint with IHS Energy) (1993-1996).
Guamal (remote onshore field) appraisal study. PDVSA (1998).
East & West divisions asset optimization studies (Macroproyecto Incremental Reservas). Lagoven (1994-1995).
Sur del Lago (Maracaibo) Xtra-light oil appraisal study. Lagoven (1998).
Maturin East New areas appraisal study. Apertura Venezuela. 8 Blocks (1992-1993).
Rio Caribe gas & condensate production options studies. Lagoven (1990-1991).
Monagas heavy oil development options (PRISMA). Lagoven (1996-1997).


Environmental Studies.
Rio Caribe Project. Environmental Impact Study. Lagoven (1991-1992).
Aperture Areas. Data Gathering, sampling & Analysis Guidelines (1994-1995).
Posa Platform decommissioning. Env. safety audit. Contingency Plan Eng. Lagoven (1992-1993).
Cristobal Colon Project. Environmental Impact Study. References Terms & Plans. Lag., Exxon, Shell, Mitsubishi(1996).
Remote areas. Options for disposal of exploratory drilling waste. PDVSA.(1998).
Golfo de Venezuela, Falcon Nor Este, Ensenada de la Vela. Preparation of questionnaires for Authorization of Territorial Occupance (AOT). PDVSA (2004).

Technical Assistance.
Management assistance, Lagoven (1995 - 1996): Support to the Technology of the Western Division of Lagoven, in its production, transportation, financial and operating control process, planning and analysis, feasibility studies and evaluation of technical and commercial bids.
ARAR, Lagovén (1996 - 1997):
* Design and implementation of the early capture of talent.
* Replacement of specialized personnel in operating areas.
New Business management, Lagoven (1996 - 1997): Exploration and exploitation of LNG.

Front End Engineering & Conceptual Design.

Centralization of light San Tome west infrastructure. PDVSA. (2002).
La Salina & Tia Juana port facilities evaluation and Revamping. Lagoven. (1994-1995).
POSA platform decommissioning engineering. Lagoven. (1994-1995).
Production Test Barge 3457. Conversion to FSO. Lagoven. (1994).
Rio Caribe Project logistic Base (Carupano). Basic Engineering. Lagoven. (1992).

Simulation and Model Development.

ExcelTec has executed Model Development and Simulation Projects using simulation tools such as WITNESS. WITNESS is a tool capable of supporting discrete and continuous systems for business simulation.

Relevant models and studies:

ASCAM. Supply & distribution of hydrocarbons in Caracas. Dual or single system. PDVSA. (2000-2001).
FERROCAR. Freight and passenger train system. western Venezuela. IAFE (2000).
TAP Caripito – Guiria crude oil transport and deep water terminal study. PDVSA, BP &  AMOCO. (1997-1998).
Maracaibo Lake. Dedicated barges to supply Boats Logistics reengineering. Lagoven. (1993-1994).
Lake Maracaibo Drilling & RA – RC assignment schedule optimization. Lagoven (1994-1996).

Development of Methodology, Digital Models & IT Applications / Technical Software.

WITNESS Models. (TAP, Ferrocar, ASCAM)(1997-1998, 1999-2001, 2001-2002).
Optimal drilling and RA / RC schedule of Mobile units. Lake Maracaibo. (RUTAS) Lagoven.

Public and Private Sectors.
Cooling and Fanning System, Line 3, Cametro (1991): IPC of water cooling systems and forced fanning. Covering the acquisition of advance and deviation control mechanisms, setting up support procedures and general plan.
Management Support, Hidrocapital (1991): Budget planning, management control, bids, and organizational development.
Telephone exchange of Boleíta y Los Palos Grandes, Michelena, Valencia, Carabobo State station.
Adaptation of type PATS telephone exchange (Pto. La Cruz, Carúpano, El Vigía and San Juan de Los Morros).

Copyright © 2007 
ExcelTec C.A.